浙江海盐装配式建筑产业基地
国际领先、上下游全产业链的综合性园区;自动化生产、年产60万m³各类装配式预制构件;占地500亩,总投资24亿
项目名称:上海城建建设(实业)集团嘉兴装配式建筑基地
项目类型:建筑/规划
设计方:上海诚建建筑规划设计有限公司
联系邮箱:52691753@qq.com
项目设计:2018~2019年
完成年份:2022年
设计团队:王纪来、陈培良、范少君
项目地址:浙江·海盐
建筑面积:341116㎡
摄影版权:上海城建建设实业集团
制造建筑的建筑
A Building that Manufactures Buildings
Shanghai CITI-RAISE Construction Group Jiaxing Prefabricated Construction Base

一座生产预制构件的工厂,也以自身回应装配式建筑的建造逻辑:9 米柱距、27 米与 30 米结构跨度,以及屋面、外墙和天窗共享的 3 米模数,将生产空间与构件制造联系起来。
A factory that produces precast components and, in its own design, answers to the logic of prefabricated construction: a 9 m column spacing, structural spans of 27 m and 30 m, and a 3 m module shared by the roof, the exterior walls, and the skylights link the production space to the manufacture of the components.

项目阐释
Project Description
工厂是现代建筑最早将生产理性转译为空间秩序的类型之一:贝伦斯的 AEG 涡轮机工厂以结构节奏赋予工业生产公共形象,范内勒工厂以连续采光、开放结构与清晰的工艺组织塑造出“日光工厂”,其后的工业建筑又不断将构件、设备与装配逻辑推向可见表达。贯穿这些原型的并非某种固定形式,而是一条持续有效的原则——生产流程不是被建筑容纳的内容,而是生成建筑的首要力量。
The factory is one of the earliest building types in which modern architecture translated the logic of production into a spatial order. Behrens's AEG Turbine Factory gave industrial production a civic image through its structural rhythm; the Van Nelle Factory shaped the notion of the “Daylight Factory” through continuous glazing, an open structure, and a clear organisation of process; and the industrial buildings that followed have kept pushing the logic of components, equipment, and assembly toward visible expression. What runs through these prototypes is not any fixed form but a principle that remains in force: the production process is not what the building houses — it is the building's primary generator.
嘉兴基地承接的正是这条线索:它继承以工艺组织平面、以结构释放生产空间、以采光改善工作环境的工业建筑传统,又向前推进一步——制造装配式建筑的工厂,自身也应成为装配式思想的验证场。它由此发展了工业建筑原型,将预制构件、连接节点、围护界面、数字追溯与研发实验纳入同一套建筑逻辑:建筑既是生产发生的场所,也是展示生产方式的实体样本。
The Jiaxing base takes up exactly this line of inquiry: it inherits the tradition of organising the plan around process, releasing the production space through structure, and improving the working environment through daylight, and takes the tradition one step further — a factory that makes prefabricated buildings should itself become a proving ground for the idea of prefabrication. From this, the base develops the industrial-building prototype, bringing precast components, connection nodes, envelope interfaces, digital traceability, and R&D experimentation into a single architectural logic: the building is both the setting in which production occurs and a 1:1 specimen that puts that production on display.

伴随新型建筑工业化持续推进,装配式建筑已从单项构件技术转向覆盖设计、生产、施工与运维的系统能力。2018 年,上海城建集团在嘉兴规划约 500 亩用地,建设装配式建筑研发与示范基地,室内面积约 220,000 ㎡、室外整备场地约 120,000 ㎡,包含生产车间与实验室。面对大尺度、重物流与多专业协同,设计不从预设的厂房形象出发,而是回到更根本的问题:建筑如何准确地服务构件生产,又让生产本身成为可被阅读的空间与形象?
As the new industrialisation of construction has continued to advance, prefabricated construction has moved from a single-component technology to a systemic capability covering design, production, construction, and operation. In 2018, the Group earmarked a site of roughly 500 mu (≈33.3 ha) in Jiaxing to build an R&D and demonstration base for prefabricated construction, comprising production halls and laboratories, with a total indoor area of approximately 100,000 m² and an outdoor staging area of about 70,000 m². Faced with large spans, heavy logistics, and the coordination of many disciplines, the design starts not from a preconceived image of a factory but from a more fundamental question: how can the building serve the production of components precisely, and at the same time let that production become a space and an image that can be read?

工艺先于形式的平面组织
A Plan Organised Around Process, Not Form

基地平面以装配式构件的连续流动为骨架。设计从材料进场、构件生产与检测、室外整备直至成品出厂的全过程出发,统筹生产分区、通道、开口与建筑边界,并在同一套系统中辨识和组织人员、车辆、物料与成品构件的不同路径。平面因此不再是房间清单的拼合,而是一张由工艺节拍、运输半径与安全边界绘制的生产地图。
The plan of the base is structured around the continuous flow of prefabricated components. Working from the full sequence — from the intake of materials, through component fabrication and inspection, to outdoor staging and the dispatch of finished products — the design coordinates production zones, circulation routes, openings, and the building envelope, and distinguishes and organises the different paths of people, vehicles, raw materials, and finished components within a single system. The plan is therefore no longer an assemblage of room schedules; it is a production map drawn by the rhythms of process, the radius of transport, and the limits of safety.
生产车间与实验室也不是彼此隔离的两类功能。实验、检测与研发嵌入生产体系,使技术问题能在生产现场被发现、验证并反馈;室内制造与室外整备相互衔接,构成从研发到示范的完整链条。建筑在此承担的不只是遮蔽与容纳,更是将复杂协作转化为清晰空间关系的组织工具。
Neither are the production halls and the laboratories two functions sealed off from one another. Experimentation, testing, and R&D are embedded in the production system, so that technical problems can be identified, verified, and fed back at the production line itself; indoor fabrication and outdoor staging connect with one another to form a continuous chain from research to demonstration. Here the building does more than shelter and contain: it is an instrument of organisation that turns complex collaboration into a clear set of spatial relations.
结构与采光支撑生产空间
Structure and Daylight Scaffolding the Production Space

Industrial production keeps evolving, and the factory must respond to both present use and future adjustment. The Haiyan standard factory adopts an assembled monolithic concrete frame structural system: the principal components — frame columns, frame beams, crane beams, roof beams, and the foundation beams for the exterior wall panels — are all precast in the factory, delivered to site, and joined at the nodes to form a monolithic whole. The building is itself assembled from prefabricated components, so that the prefabricated production of components and the prefabricated construction of buildings come together in one place.

Natural daylight is also drawn into this component order. Both workshop types carry skylights 3 m wide: 3 × 23.6 m in the 27 m-span workshop and 3 × 28.6 m in the 30 m-span workshop, laid out at 15 m centres and staggered between adjacent bays. The long sides of the skylights run along the span, distributing the roof openings across the deep production space; the staggered arrangement between adjacent bays is intended to give the daylighting a complementary pattern. The repeated rhythm of the openings, together with the column grid, establishes the scale and the sense of direction inside.
从屋面到墙面的构件秩序
A Component Order, from Roof to Wall

As a base for prefabricated construction, the factory's envelope is articulated through a clear set of component dimensions. Both the roof and the exterior walls are built with double-tee slabs, with a standard slab width of 2,980 mm and a 20 mm joint, together forming a 3 m standard module. The 9 m column spacing corresponds to exactly three slab-width modules, and the skylight width corresponds to one. The structural grid, the slab joints, and the daylight openings therefore share a common dimensional reference, allowing precast production, the layout of components, and the architectural expression to be coordinated.

The principal roof double-tee slabs are 25.6 m and 28.6 m long; the exterior-wall double-tee panels are 14.98 m tall and bear directly on foundation beams 600 mm wide, 770 mm deep, and 8,980 mm long. The long dimensions of the roof slabs and the vertical dimensions of the wall panels each respond to the construction requirements of the roof and the perimeter envelope, while the slab width and the joints they share bring these differences into a single modular order.

This coordination does not mean that every component dimension is a whole multiple of 3 m: the relationship between the 2,980 mm slab width and the 20 mm joint shows that the standard module is realised through the actual component size together with the joint. The rib height of the double-tee slabs also varies with the span and with the position of the panel — measured from the top of the slab, the rib height is 1,000 mm for the 27 m-span roof slabs, 1,200 mm for the 30 m-span roof slabs, and 600 mm for the exterior wall panels; the slab width and the joint remain constant. The rhythm of the building is established by components that can be produced repeatedly, and is then worked out in detail at the supports, the connections, and the edge details. The factory is therefore not only a user of prefabricated components; it is a 1:1 specimen in which the production of components is translated into a complete architectural space.
数字化运行与研发平台
Digital Operations and an R&D Platform
项目进一步将信息流纳入空间组织。数字化、可追溯的材料管理系统贯穿材料、生产与检测环节,使实体构件的移动与数据记录相互核验;标识系统成为生产运行的一部分,帮助人员在大尺度场地中辨识分区、路径与作业界面。实验室与生产的高度整合,使研发不再停留于独立空间,而能直接介入工艺改进与产品验证。
The project goes further and folds the flow of information into the organisation of space. A digital, traceable material management system runs through the materials, production, and inspection stages, allowing the movement of physical components to be cross-checked against their data records; the identification system becomes part of the production operation, helping people read the zones, the routes, and the work interfaces across the large site. The close integration of laboratory and production means that R&D no longer stays in a separate room, but can intervene directly in process improvement and product validation.
当物流、信息流与研发流程被共同纳入建筑,基地便从单一生产厂房转化为产业基础设施:既生产构件,也测试技术、沉淀标准并展示成果。研发、实验、生产与示范不再是四个相邻的部门,而是由空间与系统连接的连续过程。
Once logistics, information flow, and R&D process are all brought into the building, the base shifts from a single production plant to an industrial infrastructure: it produces components, but it also tests technologies, accumulates standards, and puts results on display. R&D, experimentation, production, and demonstration are no longer four adjacent departments; they are a continuous process linked by the space and the systems.
可迁移的工业建筑原型
A Transferable Industrial-Building Prototype

项目可迁移的经验来自工艺组织与构件尺度的协调:9 米柱距与 3 米板材模数建立重复规则,27 米和 30 米结构跨度回应大跨生产空间的需求,模数化天窗将自然采光纳入屋面排布。这些具体选择与物流、研发及数字化管理共同构成基地的空间基础,也为理解装配式工厂如何组织自身建造提供参照。
The lessons the project offers for transfer lie in the coordination between process organisation and component dimensions: a 9 m column grid and a 3 m panel module set up the rules of repetition, 27 m and 30 m structural spans meet the demand of large-span production space, and modular skylights bring natural daylight into the layout of the roof. These concrete choices, together with the logistics, R&D, and digital management, form the spatial basis of the base, and offer a reference for understanding how a prefabricated factory organises its own construction.

“制造建筑的建筑”因此具有双重含义:它首先是一座制造预制构件、输出建筑产品的工厂,同时又以自身说明建筑如何被标准化、生产、装配与持续优化。厂房不再是产业活动沉默的背景,而是一台建筑尺度的工业母机、一件可被检验的示范样本,以及连接技术研发与建成环境的公共界面。项目没有以建筑装饰生产,而是在生产秩序中重新发现建筑。
“A Building that Manufactures Buildings” therefore carries a double meaning. It is, first, a factory that produces precast components and delivers them as building products; at the same time, it is itself a demonstration of how a building can be standardised, produced, assembled, and continuously improved. The factory is no longer a silent backdrop to industrial activity; it is a building-scale machine tool, a 1:1 specimen that can be examined, and a public interface that links technical R&D with the built environment. The project does not dress production in the language of architecture; it rediscovers architecture in the order of production.